Fully Automatic Operation System 2.0 for Smart Metro
TRANAVI Qiji® Train Autonomous Control System (TACS)
Urbalis® 888 Train Control System Solution
TRANAVI® Train Control System Solution
INTXIS(CTCS2+ATO)Train Control System Solution
Beidou Positioning Based Train Autonomous Control System (TACN)
Centralized Traffic Control System (FZk-CTC)
Train Dispatching Command System (TDCS)
Railway Integrated Dispatching System (RIDS)
Computer Interlocking System (iLOCK-II)
Computer Interlocking System (iLOCK)
Compute Interlocking System (VPI)
Full Electronic Computer Interlocking System(iLOCK-E)
Both Dongguan-Huizhou Intercity Railway and Foshan-Zhaoqing Intercity Railway applied CASCO’s CTC signaling system, and were successfully connected to the Pearl River Delta intercity rail transit CTC dispatching center newly built by CASCO.
At the same time, Dongguan-Huizhou Intercity Railway adopted CASCO’s C2+ATO signaling system, which marks the application breakthrough of CASCO's onboard device for high-speed railway. Based on the CTCS-2 train control system, the system added automatic train operation (ATO) and has such functions as automatic operation between stations, programmed stop, automatic adjustment of train operation and linkage control of train door and screen door, creating a new mode combining high-speed railway and metro and further imporving the operational efficiency and safety.
86 -21-5663 7080
041-35775(Railway)